Electrical grids

The electrical grids of the United States and Italy have recently shown
deficiencies. To prevent them, Catalan engineers are faced with the
following problem.

Electricity must be sent, through several wires, from a power plant
where it is produced to a city where it is consumed. Each wire is
defined by some capacity and by two vertices that join them to other
wires: an input vertex where electricity enters the wire and an output
vertex where electricity leaves the wire. Every vertex can distribute
electricity as it likes, as long as capacity restrictions are not
violated and the amount of electricity that enters the vertex equals the
amount of electricity that leaves it.

Which is the greatest amount of electricity shippable from the power
plant to the city?

Input

Input consists of several cases. Each case begins with the number of
vertices 2 ≤ n ≤ 5000 and the number of wires 0 ≤ m ≤ 10n. Follow m
trios of natural numbers u, v and c, to indicate a wire from vertex u to
vertex v (where u ≠ v) with capacity c. Vertices are labeled from 0 to
n − 1. Vertex 0 corresponds to the power plant and vertex n − 1 to the
city. Assume 1 ≤ c ≤ 5000 and that for every two vertices u and v there
is at most one wire from u to v.

Output

For every case, print the maximum amount of electricity that can be sent
from the power plant to the city.